Celexon Professional Plus Manual de instrucciones - Página 6
Navegue en línea o descargue pdf Manual de instrucciones para Pizarra Celexon Professional Plus. Celexon Professional Plus 6 páginas. Screen
También para Celexon Professional Plus: Manual de instalación (13 páginas), Manual del usuario (8 páginas), Manual de instrucciones (8 páginas), Manual de instrucciones (11 páginas)
SETTING UP THE SCREEN
STEP 1:
Turn the adjustable feet on the underside of the housing by 90° to the front.
STEP 2:
Open the snap locks and flip open the housing cover.
(Note: Press down the centre of the housing cover slightly to open the
latches more easily.)
STEP 3:
Pull the screen all the way up by the pull-out handle. Make sure that the end
bar is held horizontally.
At least half of the entire length of the screen (projection surface and leader)
must be pulled out, only then do the gas struts lock and the height can be
adjusted.
STEP 4:
To retract the screen, grasp the pull-out handle and push the screen down-
wards. Close the housing cover and lock it with the snap locks.
celexon Europe GmbH | Gutenbergstraße 2 | 48282 Emsdetten | DE
5