DBK Drymatic Boost Bar FGPH109 Manual de instrucciones - Página 6

Navegue en línea o descargue pdf Manual de instrucciones para Secadora DBK Drymatic Boost Bar FGPH109. DBK Drymatic Boost Bar FGPH109 16 páginas. Adaptable heat drying system
También para DBK Drymatic Boost Bar FGPH109: Manual de instrucciones (18 páginas)

Set up Guide:

The Drymatic Boost Bar should be set up using the following procedure:
1.
Place Boost Bar flat on the floor with an air mover directed at the inlet grill. A Fan to Boost connector can be used to
maximize airflow through the unit.
2.
Optional - Connect any Drymatic Wall and Floor Systems or any Adaptors you plan to use.
3.
Plug the machine in and power on the air mover followed by the Drymatic Boost Bar.
4.
Reset the kWh and Hours Run meters, set your maximum temperature and press Start.
1. Position Drymatic Boost Bar with an air mover
Place the Boost Bar flat on the floor in the area/room you wish to dry. Position an air mover so that its outlet lines up with the
Boost Bar inlet.
Note - The air mover outlet should be approximately the same size as the Drymatic Boost Bar inlet and should be positioned
a maximum of 20" (50cm) away from the grill. Ideally the air mover outlet should be as close as possible to the Drymatic
Boost Bar inlet. We recommend that the air mover be rated for at least 650cfm (1100m³/hr). Failure to meet these
requirements could cause the machine to limit its power output or potentially turn off the heater completely until airflow is
improved.
Drymatic Boost Bar will always require airflow to function. The machine has sensors to detect the presence and temperature
of the input air and will control the heater accordingly. If no airflow is detected or if it is removed, a no airflow symbol will
appear on the display to indicate this. When an air mover is added the machine will analyze the airflow for approximately one
minute to confirm that it is stable before heating up.
2.1 (Optional) - Connect Drymatic Wall and Floor System
If you wish to target dry an area you may wish to use a Drymatic Wall and Floor System (sold separately).
To connect a Wall and Floor System you will need to first put the Velcro adaptor (FGB346) around the outlet of the
Drymatic Boost Bar with the hook side up. Position the Wall or Floor mat with the side with the holes facing down (logo on
top) and open it where you wish to connect the Drymatic Boost Bar.
Place the mat around the Drymatic Boost Bar outlet and close the Velcro, ensuring that a good seal is maintained. Once
the air mover is turned on, the mat will inflate and airflow will begin leaving the mat through the small holes underneath.
Many different mats and accessories are available and they can all be connected and extended via Drymatic Wall and
Floor connectors - please contact your local Drymatic representative for more information. Once the system is set up, the
machine should be set to the appropriate setting for the material being dried. (see step 4 for information on the modes of
operation.)