DCI C3210 Manual de instalación - Página 10

Navegue en línea o descargue pdf Manual de instalación para Compresor de aire DCI C3210. DCI C3210 17 páginas. C series

C Series Installation Guide
Start-Up & Test
Unpacking
Start-Up & Test
Step Seven:
As the tank pressurizes, watch the
pressure gauge. If the pressure switch
is functioning normally, the motors will
shut off at approximately 100 PSI.
Wait fi ve minutes and watch the gauge
to ensure there are no leaks in the
C Series. The system should lose
no more than one PSI per minute.
Step Eight:
Test the purge valve by pressing the
TEST button. If the valve is functioning
normally, you will hear the hiss of air
escaping for approximately ten seconds.
8
1
NOTE!
If the purge timing needs adjustment, call technical support.
www.dcionline.com
w w w. d ci o nl i n e. com
150
12
9
6
3
0
BAR
100xkPa
psi
Do not adjust the timer dials on the purge valve.
15
18
21