Copernicus BE005 Manual de montaje - Página 11
Navegue en línea o descargue pdf Manual de montaje para Equipamiento educativo Copernicus BE005. Copernicus BE005 11 páginas. Royal bamboo easel
You will need: (Not to Scale)
12
Open Tub
4x
(CC4068)
Insert Tubs and install Whiteboard
Check entire assembly for loose parts; tighten all casters, bolts, screws and nuts
Tighten all casters using
supplied Caster Wrench.
Keep wrench with unit.
Casters must be tightened
every 6 months for proper
maintenance.
11
Magnetic Lined
Dry Erase Board
1x
(AC455)
10 lbs Weight Limit
Be005 - Version A - Released March 16, 2023 - Copernicus Educational Products Inc.
Adjustable wrench 2x
Screwdriver
Caster Wrench 1x