CORA CBL-DT Manual de instrucciones de instalación y montaje - Página 4
Navegue en línea o descargue pdf Manual de instrucciones de instalación y montaje para Bastidores y soportes CORA CBL-DT. CORA CBL-DT 20 páginas. Bike rack - double tier locker
Locker Installation & Assembly Instructions
Cora Bike Rack - Double Tier Locker (CBL-DT)
4. Attach brackets to upper tier bike frame
5. Sit bike hold on to bike frame
Cora Bike Rack - Australia's Bike Parking Experts - WWW.CORA.COM.AU - PH 1800 249 878
• Attach (x4) L brackets to upper
tier bike frame. Each bracket is
secured with x2 Hex head bolts
and 2 washers
• Ensure orientation of brackets is
correct
• Sit bike hold on top of upper
tier bike frame. Wheels should
be positioned on the outside
of each bracket.
Rev 1.00 Dec 2020
©