Agrowtek AgrowDose Instrucciones de uso y mantenimiento - Página 3
Navegue en línea o descargue pdf Instrucciones de uso y mantenimiento para Bomba de agua Agrowtek AgrowDose. Agrowtek AgrowDose 11 páginas.
Installation Instructions
Mount the pump on a vertical wall surface using the holes in the mounting flanges. The center flange hole
may be used to hang and level the pump, however, the corner screw holes should be used for final mount-
ing. Use caution to avoid over-tighteneing the screws and bending the flanges.
A 120Vac wall receptacle is required within 6ft of the pump for the power adapter.
Replaceable
Pump Head
Mounting Holes
1/4" Tubing
Chemical Resistant
FDA Compliant, Food Safe
GrowNET™ Port
MODBUS RTU
Do NOT connect the GrowNET port to Ethernet networks.
Connecting Pump Tubing
Each pump has an inlet (suction) and outlet
(pressure) tube. Using included barbed tubing
connectors, install an inlet tube for each pump
into the respective concentrate container, then
install an outlet tube to the mixing reservoir or
injection manifold.
Shown with optional PBX-100 series injection
manifold designed for easy installation with a
re-circulating pump for continuous recycling.
3
© Agrowtek Inc. | www.agrowtek.com | Technology to Help You Grow™
FROM
SAMPLE
PUMP
OUT
IN
24V DC Power Jack
Pressure Outlet
Suction Inlet
RETURN
PBX-104
Injection Manifold
(optional)
WATER
TANK