Galvin Specialised Ezy-Drink Lead Safe CP-BS Manual de instalación del producto - Página 2

Navegue en línea o descargue pdf Manual de instalación del producto para Productos de fontanería Galvin Specialised Ezy-Drink Lead Safe CP-BS. Galvin Specialised Ezy-Drink Lead Safe CP-BS 4 páginas. Remote push button top assembly

Galvin Specialised Ezy-Drink Lead Safe CP-BS Manual de instalación del producto
v
PRE-INSTALLATION
NOTE: Before installation, all lines must be
flushed. We recommend that a line strainer be
installed prior to Push Button Tapware to eliminate
any foreign material.
INSTALLATION
IMPORTANT: Galvin Specialised products must be installed in accordance with these installation instructions
and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical
supply conditions must also comply to the applicable national and/or state standards. Failing to comply with these
provisions shall void the product warranty and may affect the performance of the product.
1. Disassemble & Remove Existing
− Ensure the inlet body is secure as it will lose its
support once the push button assembly has
been removed.
Remove existing push button assembly from the
inlet body (not supplied) as shown.
Not Supplied
2. Fit Replacement Top Assembly
th
Version 1, 27
Check & clean the inlet prior to fitting the replacement
assembly.
Fit new push button assembly as shown.
October 2020 Page 2 of 4
Not Supplied