Galvin Specialised Ezy-Drink Lead Safe CP-BS Manual de instalación del producto - Página 2
Navegue en línea o descargue pdf Manual de instalación del producto para Productos de fontanería Galvin Specialised Ezy-Drink Lead Safe CP-BS. Galvin Specialised Ezy-Drink Lead Safe CP-BS 4 páginas. Remote push button top assembly
v
PRE-INSTALLATION
NOTE: Before installation, all lines must be
flushed. We recommend that a line strainer be
installed prior to Push Button Tapware to eliminate
any foreign material.
INSTALLATION
IMPORTANT: Galvin Specialised products must be installed in accordance with these installation instructions
and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical
supply conditions must also comply to the applicable national and/or state standards. Failing to comply with these
provisions shall void the product warranty and may affect the performance of the product.
1. Disassemble & Remove Existing
− Ensure the inlet body is secure as it will lose its
support once the push button assembly has
been removed.
−
Remove existing push button assembly from the
inlet body (not supplied) as shown.
Not Supplied
2. Fit Replacement Top Assembly
−
−
th
Version 1, 27
Check & clean the inlet prior to fitting the replacement
assembly.
Fit new push button assembly as shown.
October 2020 Page 2 of 4
Not Supplied