Galvin Specialised Ezy-Drink TD45L Manual de instalación del producto - Página 2
Navegue en línea o descargue pdf Manual de instalación del producto para Productos de fontanería Galvin Specialised Ezy-Drink TD45L. Galvin Specialised Ezy-Drink TD45L 4 páginas. Lever bubbler tapware
PRE-INSTALLATION - MOUNTING DETAILS
−
TD90L - If the mounting holes do
not already exist, mark out and drill
the holes in the wall/sheet, as
shown in rough-in dimensions.
Note: Before installation, all lines must
be flushed. We recommend that a line
strainer be installed prior to drinking
taps to eliminate any foreign material.
50.5
TO SUIT
SCREWS
USED
INSTALLATION
IMPORTANT: Galvin Specialised products must be installed in accordance with these installation
instructions and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water
and/or electrical supply conditions must also comply to the applicable national and/or state standards.
Failing to comply with these provisions shall void the product warranty and may affect the performance of
the product.
1. Fit tap assembly
− When applying thread tape or sealant to
the inlet, ensure the opening is not
obscured. Failure to do so may restrict or
block the flow restrictor, affecting the flow
of water.
ASSEMBLY
(SIDE VIEW AS
INSTALLED)
135 NOM
1/2" BSP
2. Secure the body
− Secure the body with supplied screws.
− Ensure outlet is 15° angled.
Version 2, 8 June 2017, Page 2 of 4
120
70°
1/2" BSP
TD45L
15°
64
ASSEMBLY
(AS SEEN BY USER)
TD90L