AGT INDUSTRIAL AGT-B1000 Manual del producto - Página 6

Navegue en línea o descargue pdf Manual del producto para Sistemas de elevación AGT INDUSTRIAL AGT-B1000. AGT INDUSTRIAL AGT-B1000 19 páginas. Two-post auto lift

2.2.3 Install Cables (2 Cables in total)
Red & Blue color in this Fig are showing how to route the 2 cables ( Fig 4 )
2.2.4 Install Hydraulic Hose (2 Hose in total)
Connect the longer hose in between the 2 cylinders, connect the short hose in between the
cylinder and the power unit.
wrench to fasten completely. (Fig 5)
Fig 4 Cable Routing Diagram
Please hand tighten to avoid thread damage, then use hand
Page 6 of 19