Centrometal BioSolid 26 Instrucciones técnicas - Página 4
Navegue en línea o descargue pdf Instrucciones técnicas para Caldera Centrometal BioSolid 26. Centrometal BioSolid 26 17 páginas. Steel hot water boilers
![Centrometal BioSolid 26 Instrucciones técnicas](/uploads/products/server2/2045470/2045470.jpg)
General, boiler description, delivery, additional equipment
1.0. GENERAL
Hot water boiler BioSolid have modern design, is made of proofed high-quality
materials, welded by state-of-the art technology and meets all requirements for
connection to central heating system.
1.1. BOILER DESCRIPTION
Steel boilers BioSolid, with an rated thermal output 17, 26, and 34 kW are
constructed for wood firing. They are intended for heating of small and middle sized
premises. Widely sized combustion chamber enables the firing with wood pieces of
500 mm for boilers 26 and 34 kW and 330 mm for boilers 17 kW. One filling period
lasts min. 2 hours, with the possibility of prolonging it to the whole day, if the heating
requirement is decreased. The functioning of the boiler is steered by the built-in
digital regulation system. The boiler must be connected to the central heating
system through an appropriate number of the CAS water accumulators or directly to
the central heating system.
Boiler cleaning is very simply and can be done from the
front and back side.
1.2. DELIVERY OF BioSolid BOILER
The boiler BioSolid (covered by the casing with an thermal insulation and with built-
in the digital boiler regulation), sensor for accumulation tank and scraper for
cleaning (scraper, zipper), base protection.
1.3. OBLIGATORY ADDITIONAL EQUIPMENT OF BOILER BioSolid
INSTALLED TO CLOSED CENTRAL HEATING SYSTEM
-Thermal shut off valve (such as CALEFFI 543 513)- 1 piece
4
Technical instructions BioSolid
Figure 9. Openings for cleaning flue gas chamber
A
Technical instructions BioSolid
Boiler cleaning and maintenance
openings for cleaning
flue gas chamber
Detail A
29