Adey MagnaClean CP1-03-01123 Instalación y mantenimiento - Página 2
Navegue en línea o descargue pdf Instalación y mantenimiento para Equipamiento industrial Adey MagnaClean CP1-03-01123. Adey MagnaClean CP1-03-01123 2 páginas.
Installation instructions
MagnaClean
®
is an incredibly powerful magnetic
fi ltration range designed to tackle demanding
light commercial heating systems through to heavy
industrial applications.
The exceptional design characteristics and
high quality production of MagnaClean make
installation and ongoing maintenance extremely
straightforward.
Correct installation and servicing is essential to
ensure optimum operating performance and a
longer operational life for the system.
Flexible magnetic
fi ltration options
MagnaClean's powerful and proven magnetic
fi ltration capability and robust design make
it ideal for the broadest range of commercial
heating and ventilation systems.
As can be seen in the following diagrams, MagnaClean provides
a number of installation solutions in terms of unit size and location.
The typical HVAC system illustrated identifi es two of these options within the various circuits.
Installation with Cascade (zoned) system
B
B
A
* Postition A is the recommended best practise installation option. Position B could be added in as an
option to further protect the system.
Installation with a
Installation with a
Low loss header
Plate to plate
For chiller systems, it is recommended that a MagnaClean is installed on the return of the system before the chiller.
Pressure differential fl ow
N.B. Flow analysis created with CFD
For latest prices and delivery to your door visit MyTub Ltd - www.mytub.co.uk - [email protected] 0844 556 1818
Measurements table
Filter
Inlet
No. of
ADEY product
Description
diameter
size
magnetic
code
A
B
ØC
(mm)
(mm)
rods
CP1-03-01123
2'' fi lter
160
50
5
262
18
245
CP1-03-01124
3'' fi lter
210
80
6
330
15
295
CP1-03-01125
4'' fi lter
216
100
7
360
15
299
CP1-03-01126
6'' fi lter
324
150
9
470
18
430
1
1
2
2
3
3
4
4
5
5
A
A
B
B
E
C
C
D
D
C
K
Step by step guide to installation
E
E
Follow the illustrations and measurements for easy installation of MagnaClean. There are four key steps to
successful installation:
F
F
Rev
Drawn
Date:
Change No
Checked By
Rev
Drawn
Date:
Change No
Checked By
Rev
Drawn
Date:
Change No
Checked By
Step 1
Finish:
Tolerances
DWG NO.
Title:
Sheet:
Material:
COMMERCIAL FILTER
1 of 1
Unless Otherwise Stated:
GENERIC SIZE
0 - ±0.5
Scale:
0.X - ±0.2
INFORMATION
NTS
0.XX - ±0.1
Use the measurements table to identify the correct length of pipework to be cut-out, allowing for your
angular tols. ±0.1°
isolation valves (refer to measurement A). We recommend installing on the primary circuits on the return to
the boiler. Ensure to leave enough room above the MagnaClean to access and remove the magnets easily
during servicing.
Step 2
Install the isolation valves and connect the two PN16 fl anges to the isolation valves.
Step 3
Install MagnaClean, ensuring that all fi ttings are aligned correctly and secure, integral lifting eyes are
provided for safe working practice. Install a fi xed drainage pipe and drain valve to the 1¼" BSPP drain point
at the base of the unit. Alternatively, remove the drain plug and connect to a drain hose when servicing.
Step 4
Having checked the installation, run the system for a period of time. Ensure the isolation valves are fully open
and there are no leaks.
Measurement (mm)
ØD
ØE
F
G
H1
H2
J
ØK
L
M
165
60
125
51
291
253
-9.5
160
18
4
200
92
160
60
331
278
2.5
210
18
8
220
113
180
72
347
303
15.5
216
18
8
285
164
240
73
446
333
2
324
22
8
6
6
7
7
8
8
A
A
B
B
C
C
J
D
D
G
L No. of M
E
F
This drawing remains the property of
ADEY Ltd. and must not be
Adey Ltd.
copied or passed to a third party
Gloucester Road
Size:
without written permission.
Cheltenham
A3
Phone: +44 (0)1242 546700
Professional Heating Solutions
GL51 8NR
Email: [email protected]