Gamma Progression Els Manual del usuario - Página 4
Navegue en línea o descargue pdf Manual del usuario para Máquinas de encordar Gamma Progression Els. Gamma Progression Els 20 páginas.
También para Gamma Progression Els: Manual del usuario (20 páginas), Manual del usuario (19 páginas)
ASSEMBLY INSTRUCTIONS
Transportation Screw
The machine has been shipped with a motor
and load cell protection screw. Remove the
screw before using the machine. Retain the
screw for future shipment. Install the included
rubber grommet into the hole.
Remove this Screw
String Clamp Installation
The post of the string clamp and tube of the
string clamp base are treated with grease to
provide protection against corrosion during
shipping. Remove any excessive grease with
a clean cloth prior to use. The post and tube
may also be cleaned with isopropyl alcohol.
After this type of thorough cleaning, the post
and tube should be treated with a light coating
of machine oil to protect the surfaces against
corrosion and to ensure smooth operation.
4