Gamma PROGRESSION ST Manual del usuario - Página 10

Navegue en línea o descargue pdf Manual del usuario para Máquinas de encordar Gamma PROGRESSION ST. Gamma PROGRESSION ST 19 páginas.

STRINGING THE FRAME
Weaving the Cross Strings
Weave the cross strings over and under the
main strings being careful to alternate the
weave direction of each consecutive cross
string so as to be opposite of the previously
installed cross string.
Once the final cross string is tensioned and
clamped, tie off at the appropriate hole speci-
fied by the racquet manufacturer.
9