Green Brook LEDFLP10N Instrucciones de instalación

Navegue en línea o descargue pdf Instrucciones de instalación para Luz de inundación Green Brook LEDFLP10N. Green Brook LEDFLP10N 2 páginas. Led rechargeable work/flood lights

LED Rechargeable Work/Flood Lights
INSTRUCTIONS BEFORE COMMENCING
Both the 10W (LEDFLP10N) and 20W (LEDFLP20N) fittings are
portable/rechargeable COB flood lights. The internal
rechargeable and cordless operation allows for complete
portability.
• Do not look directly at the LED lights, this may cause eye
injury.
• To reduce the risk of electric shock, do not submerge the
units or its accessories in any liquid. Units are water resistant
(IP65) but NOT waterproof.
• Store unit in a clean dry place.
• Protect LED lens from damage and scratchi
Mains Charger:100V-240V AC Car Charger: 12V DC
1. Plug the DC output plug from either adapter into the DC IN
PORT of the unit and then plug the 100-240V AC or the 12V
DC adapter into the appropriate electrical socket
(depending on which charger is being used).
2. Unplug chargers after a full charge is achieved (approx 5
hours with 100-240V mains charger).
3. Can also be operated directly from the mains charger.
(When fully discharged the battery may require 5 minutes of
charging to restart operating with 100-240V AC charger).
Charging Operation Indicator: Car charger/Main Adapter
A. LED flash red (needs charging) green (fully charged)
B. When fully charged the LED light will stay green
1. To attach it to the BASE, remove the MOUNTING BOLT and
place the light on top, aligning the hole in the mounting
bracket to the hole in the base. Replace the bolt and
tighten securely.
2. The switch has three settings:- 0:OFF, I: 60% operation and
II:100% operation.
3. Adjust the angle of the light by grasping the PADDED
HANDLE and tilting the face of the flood light up and down
or swiveling right to left.
1. Handle
2. Tilt Adjustment Screw
3. U-Shaped Bracket
4. Stand
5. Power Switch
6. Power Socket
7. Fixing Screw for stand
Installation Instructions for
- LEDFLP10N & LEDFLP20N
PLEASE ENSURE YOU READ THESE
ANY INSTALLATION
IMPORTANT

CHARGING THE BATTERY

WORK LIGHT OPERATION
1.
2.
3.
4.
ng.
.
6.
7.
5.