Green Brook Phoenix ELLEDH2 Manual de instrucciones de instalación y funcionamiento - Página 2
Navegue en línea o descargue pdf Manual de instrucciones de instalación y funcionamiento para Equipos de iluminación Green Brook Phoenix ELLEDH2. Green Brook Phoenix ELLEDH2 6 páginas. Led 4 in 1 hanging sign light
Note:
To remove hanging fitting from the main body
unscrew metal cap as shown. Remove screw
to release fixing screws to attached chosen
bracket.
For Hanging Sign - Dia 1
To install the unit as a hanging sign, open main case and connect battery. Close case and screw shut.
Using the ceiling mount bracket as a template mark the location of the fixing holes the cable can be
side or rear entry. Connect the wiring as per the wiring instruction. Adjust the height of the hanging
sign (see section on sign height adjustment and fix the unit into place).
For Recess Mounting - Dia 2
To fit the recess mounting bracket into a ceiling cut a suitable slot using the bracket as a template.
Note maximum ceiling thickness is 20mm.
Remove ceiling mount and hanging points from the sign and connect the battery. Clip the main
body into the recess mount clip ensuring that the test button lines up with the cut out in the mounting
bracket. Wire the unit to a suitable junction box as per the wiring instructions. To insert the sign into
ceiling fold back the clips on the mounting bracket so they pass through the cut slot in the ceiling and
then allow them to spring into place.
For Flagpole and Wall Mount Signs - Dia 3 & 4
For Flag pole and wall mounting, use the brackets as shown in dia 3 and 4. To fit brackets remove
hanging attachments from main body and connect the battery, secure brackets to body using the
retained screws. For flagpole mounting fix bracket to the wall in the chosen location before securing
to the main body. Note the mains wire from the body is threaded through the bracket.
Connect the wiring to a suitable junction box as per the wiring instructions.
Hanging
Ceiling
Dia.1.
Recessed
Dia.2.