Green Gorilla ProLine Em Manual del usuario - Página 12

Navegue en línea o descargue pdf Manual del usuario para Pulverizador de pintura Green Gorilla ProLine Em. Green Gorilla ProLine Em 20 páginas. Industrial system

PowerPack Operation

PowerPack Attachment

Rest the bottom of the PowerPack on the bottom of the tank's PowerPack mount-
ing recess (as shown above in gure 26) and tilt upwards into the pocket and
engage the quick connect tting (as shown below in gure 27), until a positive
click is heard. PowerPack is now ready for use.

PowerPack Removal

The PowerPack MUST be removed correctly or damage may occur. To remove the
PowerPack from the tank, rotate the release knob in the COUNTERCLOCKWISE
direction until the knob indicator is in-line with the arrow on the housing ( gure 3).
Pull the PowerPack away from the tank to fully remove ( gure 29).
DO NOT attempt to pull the PowerPack o without rst rotating the knob.
Note: the knob is spring loaded, and will automatically reset when released.
30°
Pg. 11
g. 26
g. 28
g. 27
g. 29