Gantner Q.brixx Manual de inicio rápido - Página 2

Navegue en línea o descargue pdf Manual de inicio rápido para Instrumentos de medida Gantner Q.brixx. Gantner Q.brixx 3 páginas.

Gantner Q.brixx Manual de inicio rápido
4. After all the bases have been attached and secured together, connect the right side handle.
Secure the right side handle using the same 2.5 mm hex key (2 x screws):
5. Once all the bases have been secured and the handles are secured, it is time to configure the
address for each module. The address is configured on the base of the module using the DIP
switches. There are 2 sets of DIP switches on a base; using the larger set, set the address using
the first 8 switches.
Example:
Key:
1 = UP
0 = DOWN
Gantner Instruments Incorporated
9835 Carroll Centre Road, Suite 100
San Diego, CA 92126 USA
ADDRESS
DIP SWITCH SETTING
0
00000000
1
10000000
2
01000000
3
11000000
4
00100000
5
10100000
6
01100000
7
11100000
 www.gantnerinstruments.com
Toll Free: (877) 725-6997 (877 QBLOXXS)
Direct:
(858) 537-2060
Toll Free Fax: (800) 303-9381
Direct Fax:
(858) 537-2064