GREEN LINK KnuckleHead Manual de instalación - Página 2

Navegue en línea o descargue pdf Manual de instalación para Aire acondicionado GREEN LINK KnuckleHead. GREEN LINK KnuckleHead 2 páginas. Solar support

GREEN LINK KnuckleHead Manual de instalación
SOLAR KNUCKLEHEAD
STEP 1
LAYOUT AND
PREPARATION
Mark areas where KnuckleHeads
will be positioned. For best results,
clean roof membrane with alcohol to
maximize adhesion of GREEN LINK
Adhesive/Sealant.
STEP 2
ATTACHING
BASE
Apply GREEN LINK Adhesive/Sealant
to Universal Base and press onto
membrane surface. Use mechanical
fasteners to attach base directly to roof
deck.
STEP 3
SEALING BASE
PERIMETER
Once base in pressed into place, apply
GREEN LINK Adhesive/Sealant around
the base perimeter.
STEP 4
INSTALLING
EXTENSION
Slide extensions into base.
STEP 5
INSTALLING
FLASHING BOOT
Slide boot over extension and press
to membrane.
5519 E Cork St, Kalamazoo, MI 49048 | www.greenlinkengineering.com | 888.672-9897
INSTALL ATION GUIDE
STEP 6
STEP 7
STEP 8
(OPTIONAL)
STEP 9
STEP 10
SEALING BOOT
PERIMETER
Follow manufacturer's instructions
for sealing boot using heat welding
and or GREEN LINK Adhesive/
Sealant.
INSTALLING
HEAD
Mate solar head to extension.
Adjust for height by rotating head.
CHANGING
ANGLE
If other than a 15-degree angle is
desired, position Solar Wedge into
head to either increase or decrease
angle.
INSTALLING
CHANNEL
5/8
5/8
Fit 1
" x 1
" channel into
heads, in linear and elbow
configuration. Attach channel with
standard bolts.
ATTACHING
PANEL
Mount panels on channel and bolt
into place.