Cequent PRO Series Manual
Navegue en línea o descargue pdf Manual para Accesorios para bicicletas Cequent PRO Series. Cequent PRO Series 12 páginas. Axis 3 bike carrier
También para Cequent PRO Series: Manual de instrucciones (9 páginas), Manual de instrucciones (9 páginas), Manual (6 páginas)
![Cequent PRO Series Manual](/uploads/products/server2/2078394/2078394.jpg)
Kit Contents:
Main Support Assembly
Upper Support Tube
Lower Support Tube
Upper / Lower Hook Straps
Cradle Strap
Assembly Instructions:
1.
Align mounting holes of upper support tube with holes in main support assembly. Use a supplied ¼
carriage bolt and ¼ Nylon locking nut to fasten upper support tube to main support. DO NOT OVER
TIGHTEN. Support tube must be able to rotate freely. (Fig 1)
2.
Align mounting holes in upper support tube with adjustment slot in main support assemble. Use a
supplied ¼ carriage bolt and adjustment knob, to fasten tube to main support. (Fig 1)
3.
Repeat steps 1 & 2 for lower support tube.
4.
Pass side cam buckle straps through side strap slots on main support assembly side brackets and
through slot on trunk hook. (Fig 3)
5.
Thread upper / lower hook straps through cam buckles of main support assembly. (Fig 2)
Adjustment Knob
¼ Carriage Bolt
Cequent Performance Products
47774 Anchor Court
Plymouth, MI 48170
Technical Service: (888) 521-0510
ITEM
DESCRIPTION
1
Side Cam Buckle Straps
1
Trunk Hook
1
Adjustment Knobs
4
¼-20 x 1 ½ Carriage Bolt
6
¼-20 Lock Nut
¼ Carriage Bolt
FIGURE 1
Lower Support Tube
1370600
:
:
Trunk Mount 3 Bike Carrier
¼ Nylon Lock Nut
Page 1 of 12
2
2
4
8
4
Upper Support Tube
Main Support Assembly
¼ Carriage Bolt
Adjustment Knob
1370600N
Rev A 09-09
Printed in Taiwan