AFS Z-Line Instrucciones de instalación - Página 2
Navegue en línea o descargue pdf Instrucciones de instalación para Bastidores y soportes AFS Z-Line. AFS Z-Line 4 páginas. Standard boltless rack
ASSEMBLY OF STANDARD BOLTLESS RACK
Tools Needed: A rubber mallet for seating the shelf supports. Two people are recommended for assembly.
1.
The reference numbers used throughout this
sheet refer to the illustration on the back cover.
This is to help you to identify the various parts as
they are mentioned.
2.
Depending upon
whether you ordered a
single unit or an adder
unit, you may have one
or both of the styles of
upright shown at right:
A single unit will use EUR posts for all four
uprights, as shown below in Figure A. If you plan
on installing an adder unit, however, you should
build your starter unit
with two ZTP posts
on one end (which
will join with the
adder), as shown
in Figure B.
B. Two or more units with Angle Posts (EUR) on
each end and "T" Posts (ZTP) as intermediate uprights.
3.
With help from an associate, or using a wall for
support, connect two EUR uprights (Ref. No. 1a)
together with two front-to-
back supports (Ref.
No. 2), one at
the top and
one at the
bottom. Be
sure the
front-to-back
supports are
fully seated in
the keyhole
slots, as
shown at right.
IMPORTANT! All shelf
supports must be installed
with the flange facing UP, as
shown at right. This flange is
what the shelves will rest on.
American Filing Solutions P.O. Box 891719, Temecula, CA 92589 Toll Free: (888) 891-1970 x 8958 Fax: (888) 891-9970 Email: [email protected] www.FilingToday.com
Approximate assembly time: 15 to 30 minutes per section.
Angle Post
(EUR)
"T" Post
(ZTP)
A. Single unit with
four Angle Posts (EUR).
Narrow area
of keyhole
slot is at
bottom
NOTE: Inset is shown
from opposite side.
4.
Place a third front-to-back end support in the
middle slots of the two uprights
(or at whatever level you
want your third shelf
to be). This
forms one
end of the
shelving unit.
5. Repeat steps
3 and 4 to
construct a
second set
of unit ends.
NOTE: If you
are planning
to install an
adder unit,
this second
set should
consist of ZTP uprights
(Ref. No. 1b) so that adjacent sections can be
tied together. Carefully review step 2 and step
10 to better understand this.
6.
With the help of an
associate,
connect the two
unit ends with
left-to-right shelf
supports (Ref.
No. 3). Again,
be sure that
the flange on
the shelf
support is
facing up, and
that the shelf
supports are
fully seated, as
was illustrated
in step 3.