CORNING CCH-CF Manual de inicio rápido - Página 5

Navegue en línea o descargue pdf Manual de inicio rápido para Hardware de red CORNING CCH-CF. CORNING CCH-CF 11 páginas. Splice cassette and slack cassette for closet connector housings
También para CORNING CCH-CF: Manual de inicio rápido (12 páginas)

CORNING CCH-CF Manual de inicio rápido
10
Store up to 38 inches of cable slack under cassette.
3.
SPLICe CaSSeTTe (CCH-CS) INSTaLLaTIoN — RIBBoN FIBeR
3.1. Ribbon Fiber Preparation and Routing
Protective tubing is required
for ribbon splicing application.
TPA-3937
STANDARD RECOMMENDED PROCEDURE 003-895 | ISSUE 1 | OctOber 2011 | PAGE 5 OF 11
Loose Tube Fiber
1
2
NOTE: Ensure length of pigtail is
approximately 35 inches
from fan-out body.
Cut 9 inches of protective tubing.
CRITICAL STEP:
Slide tubing onto ribbon
up to the fan-out body.
Tight-buffer Fiber
Protect tight-buffer fiber with braided tubing, if
needed, for multiple cables or 24-fiber cables.
Ribbon Pigtail
TPA-3950
Ribbon Pigtail
35 inches
TPA-3936