CORNING MRU Montaje Manual de instalación - Página 5

Navegue en línea o descargue pdf Montaje Manual de instalación para Instrumentos de medida CORNING MRU. CORNING MRU 12 páginas. Mid-power remote unit outdoor enclosure mimo

5.
INSERT LIQUID-TIGHT FLEXIBLE CONDUITS
IN KNOCKOUTS (RECOMMENDED)
Insert the appropriate size conduits in each of the punched-
out knockouts (shown in Figure 2). See Section 2 for
recommended conduits.
6.
GROUND CABINET AND MRUs
Step 1:
Ground cabinet - refer to the manufacturer's
installation guide for instructions on cabinet
grounding. Figure 8 shows cabinet grounding
bolt location (left side panel).
Step 2:
For each MRU chassis - using one of the
grounding cables provided with the cabinet,
ground the MRU via the two-hole, standard
barrel grounding lug located on the front panel
to one of the cabinet grounding bolts. Refer to
Figure 8.
MRU grounding lug requirements:
• For use with stranded copper wire conductors
• 10-14 AWG
• Holes - 1/4-in
Corning Optical Communications
Figure 8. Example of Grounding MRUs to Cabinet
Quick Installation Sheet | CMA-595-AEN | Page 5