GARDEN MASTER GM1508 Manual de instrucciones de montaje - Página 4

Navegue en línea o descargue pdf Manual de instrucciones de montaje para Almacenamiento exterior GARDEN MASTER GM1508. GARDEN MASTER GM1508 8 páginas. Sloping roof shed

GARDEN MASTER GM1508 Manual de instrucciones de montaje
STEP 2:
BACK WALL
1.
Join 2
sheets together with 2 rivets through the overlapping ribs
A
making sure the ends of the sheets are flush.
2.
Cap sheeting with
F
same as the front wall.
3.
Rivet the channels through the end ribs and every 2nd rib between.
4.
Make sure you put at least 1 rivet per sheet up through the
underside of the channel into the pan of the sheet.
GARDEN MASTER TIP
Put extra rivets in for high wind areas,
particularly on the underside.
STEP 3:
ROOF
1.
Join 2
980mm sheets together, same as the back.
C
2.
Cap sheeting with
E
3.
Rivet the channels at every second rib but not the corners at this stage.
4.
Place the short flange of the 'L' on top of the rib at one end. Make sure ends are
flush with sheeting (diagram 4) and put one rivet in the centre to hold the 'L'.
Rivet the corners through the channels and one more between the corner
and the centre rivet. Perform the same at the other end.
5 rivets for each 'L'.
!
4
channels putting the cutouts top and bottom
F
1515mm channels.
E
DIAGRAM 4
If you choose to vary from these instructions your
warranty will be impaired.
A
G
C
i
If you need advice, call us
or email us at [email protected]
YOU WILL NEED:
A
2 x 1770mm sheets
1 x 1515mm top channel
F
1 x 1515mm bottom channel
F
SCAN TO
WATCH OUR
ASSEMBLY VIDEO
HERE
YOU WILL NEED:
C
2 x 980mm sheets
E
2 x 1515mm channels
G
2 x 980mm 'L's
E
G
FREE
on
0800 807 433