Fujitsu 18RLX Boletín de servicio - Página 4

Navegue en línea o descargue pdf Boletín de servicio para Aire acondicionado Fujitsu 18RLX. Fujitsu 18RLX 5 páginas.

1
3
• 4 zip ties are needed for correct installation.
• Secure the current sensor wires with all four zip ties according to the
arrows. Do not tie around any of the copper lines.
•Cut the ends of the zip ties.
Secure Current Sensor
2
4
1
3
4
2