AC Tool Supply S19-320D Instalación - Página 2

Navegue en línea o descargue pdf Instalación para Sistema de seguridad AC Tool Supply S19-320D. AC Tool Supply S19-320D 5 páginas. Flow switch alarm system

S19-320A, S19-320D
Read this installation manual completely to ensure proper installation, then file it with the owner
Installation
or maintenance department. Compliance and conformity to drain requirements and other local
codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding
any packaging material. If any parts are missing, do not begin installation until you obtain the
Packing List
missing parts.
IS
T H
E
S ID
U P
Flush the water supply lines before beginning installation and after installation is complete. Test
the unit for leaks and adequate water flow. Main water supply to the eyewash should be "ON" at
all times. Provisions shall be made to prevent unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley plumbed
emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure. Flushing fluid
should be tepid per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify proper
operation. This equipment should be inspected annually to ensure compliance with ANSI
Z358.1.
Workers who may come in contact with potentially hazardous materials should be trained
regarding the placement and proper operation of emergency equipment per ANSI Z358.1.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
Power should be supplied to the alarm by no larger than a 120 volt AC,
15 amp branch circuit with a dedicated circuit breaker or fuse and should
not supply power to any other device. Compliance and conformity to
local codes and ordinances is the responsibility of the installer.
2
actoolsupply.com
IMPORTANT
actoolsupply.com
10/26/2012
Installation