Kohler Finial K-316 Manual de instalación - Página 4
Navegue en línea o descargue pdf Manual de instalación para Sanitarios Kohler Finial K-316. Kohler Finial K-316 48 páginas. Bidet faucet
También para Kohler Finial K-316: Manual de instalación y mantenimiento (28 páginas)
Washer
2. Lift Rod Escutcheon Installation
Apply a bead of plumbers putty or other sealant to the underside
of the escutcheon according to the putty manufacturer's
instructions.
Insert the escutcheon through the mounting hole from above.
From the underside of the bidet, slide the washer (tapered side
up), brass washer, and nut onto the escutcheon shank.
Securely tighten the nut with a wrench. Do not overtighten.
Remove any excess putty or sealant.
1010448-2-F
Escutcheon
Apply
Plumbers
Putty.
Brass
Nut
Washer
4
Kohler Co.