Kohler BIOVE K-8277T Manual de instrucciones de instalación - Página 5

Navegue en línea o descargue pdf Manual de instrucciones de instalación para Bañeras Kohler BIOVE K-8277T. Kohler BIOVE K-8277T 9 páginas. Enameled cast iron bath

INSTALL THE BATH
INSTALL THE BATH
A1. Installation of Bath with Adjustable
Height
Slide the new bath into position.
Insert the drain tailpiece into the trap.
Level the bath by positioning metal shims and bricks
under the bath feet and ensure there is enough spate
for the drain. Attention: the metal shims are necessary
to aroid cracking of bricks. Check for level along the top
of the side of the bath and across the drain end. The
bath may have to be moved in and out of the recess
area until it is shimmed properly, if the support feet are
not accessible from the back or side.
A1.
A2. Through the Floor Drain Bath
Installation
Slide the new bath into position to verify the drain
location and the stud fit. Cut a minimum 152
hole in the floor for the drain connection.
A2.
1046553-T01-B
:
305 mm
152
305mm
5
Level
Brick
Metal shim