Kohler BIOVE K-8277T Manual de instrucciones de instalación - Página 8
Navegue en línea o descargue pdf Manual de instrucciones de instalación para Bañeras Kohler BIOVE K-8277T. Kohler BIOVE K-8277T 9 páginas. Enameled cast iron bath
COMPLETE FINISH WALL
COMPLETE FINISH WALL
CAUTION: Risk of product damage. Do not support
the weight of the bath by the rim.
Install the ceramic or marble tiles. Seal the joints
between the bath rim and the finished tiled wall using
silicone sealant. RTV (Room Temperature Vulcanizing)
sealant is recommended.
Apply a bead of silicone sealant over the seam
between the bath apron and the finish floor.
!!
(
CLEAN-UP AFTER INSTALLATION
CLEAN-UP AFTER INSTALLATION
When cleaning up after installation, do not use abrasive
cleansers as they may scratch and dull the surface.
Use warm water and liquid, non-abrasive detergent to
clean the surface.
Stubborn stains, paint, or tar can be removed with
turpentine or paint thinner. Do not allow cleaners
containing petroleum distillates to remain in contact
with the bath surface for long periods of time. Plaster
can be removed by scraping with wood edge. Do not
use metal scrapers, wire brushes, or other metal tools.
One of the powder type detergents may be used on a
damp cloth to provide mild abrasive action to the
residual plaster.
1046553-T01-B
)
8
Silicone Filler
Bath
Finished Tiled Wall
Paste Mortar
Brick or Concrete Wall
Framing Construction