Kohler K-1147 Manual de instalación - Página 4
Navegue en línea o descargue pdf Manual de instalación para Bañeras Kohler K-1147. Kohler K-1147 25 páginas. Drop-in acrylic baths
También para Kohler K-1147: Manual de instalación y mantenimiento (29 páginas), Manual de instalación y mantenimiento (25 páginas)
Secure the Bath to the Subfloor – Models With Support Blocks Only (cont.)
Spread a 2" (5.1 cm) thick layer of cement or mortar on the subfloor where the bath will be placed.
This will help secure, level and support the bath.
NOTE: The support blocks must rest directly on the support floor.
Clear all the material away from the support block locations.
NOTE: Do not use gypsum cement or drywall compound for this application, as they will not provide an
acceptable, durable bond.
Position a piece of plastic drop cloth or similar material over the cement or mortar bed.
With help, carefully lift the bath into place and make sure the support blocks do not rest in the bed
material. Verify that the bath is level and resting on all support blocks.
Insert the drain tailpiece into the trap.
Remove the protective tape from the bath rim.
Apply a continuous bead of silicone sealant around the entire rim of the bath.
Option 2: Secure Using Construction Adhesive
Apply a generous amount of high-quality construction adhesive to the bottom of the support blocks.
With help, carefully lift the bath into place and verify it is level and resting on all support blocks.
Insert the drain tailpiece into the trap.
Remove the protective tape from the bath rim.
Apply a continuous bead of silicone sealant around the entire rim of the bath.
1023730-2-F
4
Kohler Co.