Kohler P50202-00 Manual de instalación - Página 5

Navegue en línea o descargue pdf Manual de instalación para Bañeras Kohler P50202-00. Kohler P50202-00 21 páginas. Drop-in or freestanding cast iron bath

Kohler P50202-00 Manual de instalación
Drop-In Installation
3. Level the Bath
CAUTION: Risk of product or property damage. Do not support the bath by the rim. Provide
adequate support under the feet.
IMPORTANT! The bath must be level and resting on all four feet/legs.
Verify the bath is level around the perimeter of the bath rim. If the bath is not level:
For drop-in installations
Fit metal shims under the bath feet as needed. If the feet are not accessible from the back or side,
move the bath in and out to gain access.
For freestanding installations
Adjust the leveling bolts on the bottom of each leg as needed.

4. Install the Plumbing

CAUTION: Risk of property damage. Make sure a watertight seal exists on all bath drain connections.
NOTE: Provide access to all plumbing connections to simplify future maintenance.
Connect the trap to the drain according to the drain manufacturer's instructions.
Install the faucet valving and the riser tubes or wall-mount kit according to the faucet
manufacturer's instructions.
Open the hot and cold water supplies and check all connections for leaks.
Run water into the bath and check the drain connections for leaks.
Fill the bath to the overflow and check for leaks.

5. Complete the Installation

For Drop-in Installations
Cover the framing with water-resistant wall material.
Seal the joints between the bath rim edges and the water-resistant wall material with silicone
sealant.
Tape and plaster the water-resistant wall material.
Kallista
Metal Shims
5
Leveling Bolt
Freestanding Installation
1008431-2-A