Kohler ADAIR K-4636T-U Manual de instrucciones de instalación - Página 7

Navegue en línea o descargue pdf Manual de instrucciones de instalación para Aseos Kohler ADAIR K-4636T-U. Kohler ADAIR K-4636T-U 10 páginas. 4.0l exposed class five one-piece toilet
También para Kohler ADAIR K-4636T-U: Manual de instrucciones de instalación (8 páginas)

Kohler ADAIR K-4636T-U Manual de instrucciones de instalación
FILL FLOAT WITH
BALLAST
Test flush the toilet.
Periodically check all connections for
leaks for several days following
installation.
Set the tank cover in place on the tank.
Fig.#14
14
MINOR ADJUSTMENT OF
Snap

WATER LEVEL

Move the snap along "OPEN" direction.
OPEN
SCALE
5:1
Fig.#15a
15a
To lower water level: Move water cup
down to a proper height and rotate
Screw
screw anticlockwise to achieve the
desired water level. (Refer to float
adjustment instructions.)
Fig.#15b
15b
To elevate water level: Rotate screw
clockwise and raise float to the desired
water level. Elevate water cup to a
proper position as well. (Refer to float
adjustment instructions.)
Fig.#15c
15c
1285052-T01-A
-7-