Aqua A-LEGIO SENSE Manual de funcionamiento y mantenimiento - Página 8
Navegue en línea o descargue pdf Manual de funcionamiento y mantenimiento para Bomba de agua Aqua A-LEGIO SENSE. Aqua A-LEGIO SENSE 12 páginas. Panel-mounted dosing system
A-POOL TOP EVO PH-CL
3.2
CL(J) PROBE with mV signal
To fit the CL(J-mV) probe to the modular probe holder, follow the instructions provided for the CL(J) 4-20mA
probe; to prepare the probe for use, proceed as follows:
-
Remove the protective cap and unscrew the membrane cap from the cell body.
-
Open the electrolyte bottle, screw the nozzle in place and allow any excess air to come out.
-
Fill the membrane cap with electrolyte to the level as shown (see figure); avoid the formation of air
bubbles as much as you can.
-
Eliminate any air bubbles by gently tapping the cap over a flat surface. Position the cell vertically on
the filled membrane cap and screw the cap by hand until flush; proceed slowly to avoid damaging
the membrane and be careful not to cover the breather hole with your fingers, because excess
electrolyte should be free to flow out.
-
Remove the electrolyte coming out with a damp cloth or rinse
with water.
To perform the electrical connections, follow the diagram provided in the instrument's manual.
1. Electrolyte bottle
2. Membrane cap
3. Nozzle
4. Breather hole
L. Electrolyte fill level
ENGLISH
8/12