Aqua Cooler M11F Manual de uso y mantenimiento - Página 4

Navegue en línea o descargue pdf Manual de uso y mantenimiento para Dispensador de agua Aqua Cooler M11F. Aqua Cooler M11F 13 páginas.
También para Aqua Cooler M11F: Manual del usuario (5 páginas)

Aqua Cooler M11F Manual de uso y mantenimiento
UNPACKING THE WATER FOUNTAIN
1.
After unpacking the water fountain, wipe with a soft cloth. Check the unit for evidence of rough handling.
2.
Place the machine on a hard, flat surface. Make certain the unit is level. The unit should not be close to
sources of heat, otherwise performance may be affected.
3.
It is best to place the water fountain in an area with good air circulation. Make sure there is at least 75 mm
of space between the back of the fountain and the wall.

INSTALLATION

The installation must be in accordance with AS/NZS 3500.1 and AS/NZS 3500.2. Pipe jointing is a trade skill and
Aqua Cooler recommends this process is performed by qualified personnel only.
1.
Ensure proper ventilation by allowing 75 mm clearance on each side of the fountain.
2.
Minimum water pressure is 100 kPa and maximum is 700 kPa.
3.
The recommended maximum water inlet temperature is 38°C.
4.
Install a 40 mm waste trap onto the waste outlet on the rear of the fountain - not supplied.
Water in connection is secured via a 1/2" kinko nut and olive into the stainless-steel connection on the
5.
rear of the unit. It is recommended that a 1/2" shut off valve is installed at this point for ease of future
maintenance.
6.
Turn on water supply and hold down bubbler to purge the system of air until a steady stream of water
comes from the tap.
7.
For models equipped with a glass filler, please assemble the glass filler by placing the neck onto the white
tubing pre-installed on the top of the lid, as shown below.
8.
The bubbler needs to be adjusted for the correct water flow in relation to the local water pressure. On the
side of the bubbler is an inner and an outer screw. Once you have established water flow, adjust the inner
screw until the stream is in the center of the stainless-steel top.
9.
Check all connections for water leaks.
10.
Flush fresh mains water through the unit for five minutes to ensure any residual water from testing is
cleared.
11.
Plug the fountain into the building electrical supply. The unit will start automatically.
Glass filler installation
Your Partner in Cool.
4
Flow adjustment