Deye SUN-3.6K-SG03LP1-EU Manual del usuario - Página 14

Navegue en línea o descargue pdf Manual del usuario para Inversor Deye SUN-3.6K-SG03LP1-EU. Deye SUN-3.6K-SG03LP1-EU 19 páginas. Hybrid inverter

Deye SUN-3.6K-SG03LP1-EU Manual del usuario
Battery Setting
Start
30%
30%
Batt
A
40A
40A
Set2
Gen Charge
Grid Charge
Gen Signal
Grid Signal
Gen Max Run Time
0.0 hours
Gen Down Time
0.5 hours
Battery Setting
Lithium Mode
00
Batt
Set3
Shutdown
10%
Low Batt
30%
Restart
80%
This is Battery Setup page.
Start =30%---It indicates that the Generator will start when
the Battery capacity is less than 30% in Off-grid mode.
A
= 40A---It indicates the Current that the Generator
charges the Battery after starting.
Gen Charge---It indicates the Switch that the Generator
charges the Battery。
Gen Signal ---It indicates whether the Generator's ATS
signal is on or off.
Gen Max RunTime ---It indicates the longest time
Generator can run in one day,when time is up, the
Generator will be turned off. 24H means that it does
not shut down all the time.
Gen DownTime ---It indicates the delay time of the
Generator to shut down after it has reached the running
time.
This is Grid Charge, you need select.
Start =30%---No use,Just for customization.
A
= 40A--- It indicates the Current that the Grid
charges the Battery.
Grid Charge---It indicates that the grid charges the battery.
Grid Signal ---Disable.
Lithium Mode--This is BMS protocol.Please reference the
document(Approved Battery-Deye).
Shutdown 10%--It indicates the inverter will shutdown if
the SOC below this value.
Low Batt 20% --It indicates the inverter will alarm if the
SOC below this value.
Restart 40%
--It indicates the restart level when inverter
shutdown.
- 23 -
Battery Setting
Float V
55.2V
Shutdown
41.0V
Low Batt
45.0V
Batt
Absorption V
57.6V
Set3
Restart
52.0V
Equalization V
58.8V
TEMPCO(mV/C/Cell)
-5
Equalization Days
90 days
Batt Resistance
Equalization Hours
2.0 hours
25mOhms

5.7 System Work Mode Setup Menu

System Work Mode
Work Mode
Selling First
Work
Mode1
Zero Export To Load
Solar Sell
Zero Export To CT
Solar Sell
Max Sell Power
4000
Energy pattern
BattFirst
LoadFirst
Time Of Use
Time
Batt
Work
~
5:00
80%
Mode2
~
9:00
80%
~
13:00
80%
~
17:00
80%
~
17:00
21:00
80%
~
21:00
01:00
80%
There are 4 stages of charging the Battery .
This is for professional installers,you can keep it if you
do not know.
Shutdown 41V--The inverter will shutdown if the Voltage
below this value.
Low Batt 45V --The inverter will alarm if the Voltage
below this value.
Restart 52V
--Restart level when inverter shutdown.
Work Mode
Selling First
:It means that the excess energy has
priority in grid connection.
Zero Export To Load:It means output power according
to it consumed by the load.
Zero Export To CT :It means output power according
to the CT position.
Solar Sell
:It means that the excess solar energy
can be integrated into the grid.
Max Sell Power 0-8000W
Energy Pattern
BattFirst--- It means solar power will charge battery first,
when battery is full then feed-out power to the
Load or Grid.
LoadFirst-- The solar energy will be used to supply the
local load first,then to charge the battery.The
redundant power will export to the public grid.
Time of use
Switch for Grid charging the battery.
Switch for Gen charging the battery.
There are six time period can be set,
each period must from small to large.
- 24 -