Aqua Lung Calypso Manual del usuario - Página 12
Navegue en línea o descargue pdf Manual del usuario para Controlador Aqua Lung Calypso. Aqua Lung Calypso 20 páginas. Second stage
También para Aqua Lung Calypso: Boletín técnico (4 páginas), Manual de servicio (19 páginas), Manual de mantenimiento (20 páginas)
12
CALYPSO BC USER'S MANUAL
7. CALypSO pRe-dIVe CheCkLIST
diver Name_____________________________ date_____________
Calypso Number_________
WARNING: Before each use, the Calypso must be given a thor-
ough visual inspection and functional test. NeVeR dive with a
Calypso that shows signs of damage to its bladder or valves
until it has received a complete inspection and service.
Initials
______ 1.Visually inspect the Calypso, all strap and buckle assemblies.
______ 2.Remove and inspect both CO2 cartridges to check their condition.
If the CO2 cartridges have been discharged, replace them with new CO2
cartridges. Do not reinstall discharged CO2 cartridges, as this may cause
internal corrosion to occur.
NOTE: The threads of the CO2 cartridge may be lightly coated with
Christo-Lube MCG 111 (recommended) to help protect the cartridges
from corrosion.
______ 3.Connect the powerline to a clean air source, via the MP quick
disconnect hose. Depress and release the inflator button intermittently to
ensure that the airflow is unobstructed, and that the airflow stops completely
when the button is released.
______ 4.Fully inflate the Calypso until the over pressure relief valve (OPRV
opens. Manually operate the OPRV by pulling on the attached ball and cord.
Fully inflate the Calypso, once again until the OPRV opens. Ensure that it
opens to relieve excess pressure, yet immediately closes to allow the bladder
to remain taut and fully inflated.
______ 5.Fully inflate the Calypso until the OPRV on the inflator assembly
opens to relieve excess pressure, yet immediately closes to allow the bladder
to remain taut and fully inflated.
______ 6.Fully inflate the Calypso, once again until the OPRV opens.
Manually exercise the Rapid Exhaust Valve (REV) by pulling on the corrugated
hose, 1/4" of pull is all the pull that is required to open the REV (Excessive
force will damage the airway). Ensure the REV opens to release air from
the Calypso, yet closes immediately to retain existing air. Fully inflate the
Calypso until the OPRV opens, let the Calypso stand fully inflated for five
minutes. Ensure the Calypso remains firm before deflating.
______ 7. Diving supervisor will check previous steps and record deficiencies below.
WARNING: If any leakage can be heard, or if the bladder begins
to deflate within 5-10 minutes, DO NOT attempt to use the BC
until it has been repaired by a trained technician.
Remarks_________________________________________________________________
________________________
diver Signature
________________________
diving Supervisor Signature