Bilberry Stoves 8kW Stove Manual de instrucciones de instalación y funcionamiento - Página 8

Navegue en línea o descargue pdf Manual de instrucciones de instalación y funcionamiento para Estufa Bilberry Stoves 8kW Stove. Bilberry Stoves 8kW Stove 20 páginas.

Bilberry Stoves 8kW Stove Manual de instrucciones de instalación y funcionamiento
Fig.1
The minimum mantle clearance to combustibles
required are:-
5kW -
550mm to the top
500mm to the sides
8kW -
550mm to the top
500mm to the sides
10kW -
550mm to the top
550mm to the sides

CEILING PROTECTION

There must be a minimum distance of 1200mm to a combustible ceiling above the fireplace.
Clearances to Furniture & Soft Furnishings
We recommend the stove be installed 800mm from combustible material. Serious consideration should also be
given to positioning of any furniture that could be adversely affected by heat. The clearances to combustible
materials in front of the stove should be a minimum of 800mm. When lighting, a solid fuel stove will get very
hot and therefore adequate protection must be provided, particularly in situations where there is a safety risk to
children or the infirm. A suitable safety guard around the stove should be considered.

CHIMNEY

The stove is a radiant room heater and must be connected to a chimney of the proper size and type. The chim-
ney must have a diameter of at least 6" (150mm). It is best to connect to a chimney of the same size, as con-
nection to a larger size may result in a somewhat less draught.
Do not connect to a chimney serving another appliance. Minimum chimney height 15' (4.5 meters) from floor
on which stove is installed. An existing masonry chimney should be inspected and if necessary repaired by a
competent mason. The stove must be connected to a chimney with a minimum continuous draft of .06" wg (15
Pascals). Poor draft conditions will result in poor performance.
Chimneys for use with solid fuel appliances should be capable of withstanding a temperature of 1100
out any structural change which would impair the stability or performance of the chimney.
If the stove is fitted in place of an open fire then the chimney should be swept again, one month after installa-
tion, to clear any soot falls which may have occurred due to the difference in combustion between the stove and
the open fire.
BS EN 15287-1:2007, Design Installation and Commissioning of Chimneys; Part 1: Chimneys for non-room-
sealed heating appliances should be used.

MANTLE CLEARANCES

5kW
Fig.2
Fig.3
8
8kW
10kW
o
C with-