Abarqs TRAMPOLINE 10ft Manual de instrucciones - Página 10

Navegue en línea o descargue pdf Manual de instrucciones para Deportes y aire libre Abarqs TRAMPOLINE 10ft. Abarqs TRAMPOLINE 10ft 15 páginas.

Abarqs TRAMPOLINE 10ft Manual de instrucciones
TITLE-MAKING
1.
Combine the #1 and #2 poles together as shown in the figure
2.
Check that the mechanism is locked. Screw the cap on the tip of the pole.
Mount the trampoline leg poles using two screws and two distances. Tighten the screws sensitively to
reduce play on the plastic washers.
Be careful not to twist the screw. Maximum screw tightening force is 30N.
The trampoline's user manual is also available at www.abarqs.pl.
.
10