Allied Telesis CentreCOM GS980M Series Manual de instalación rápida - Página 14
Navegue en línea o descargue pdf Manual de instalación rápida para Interruptor Allied Telesis CentreCOM GS980M Series. Allied Telesis CentreCOM GS980M Series 20 páginas. Gigabit ethernet switches
3. Plug the other end of the power cord into an appropriate AC
power source.
4. Wait two minutes for the switch to initialize its management
software.
5. Verify that the POWER LED is green. If the LED is OFF, see
"Troubleshooting" on page 18.
LEDs
Ethernet Copper Port LEDs
The Ethernet copper port LEDs on the switches are described here.
Speed/Activity LEDs
Speed/Activity LEDs
Solid
The port has established a 1Gbps link to a network
Green
device.
Flashing
The port is transmitting or receiving packets at 1Gbps.
Green
Solid
The port has established a 10 or 100Mbps link to a
Amber
network device.
14
CentreCOM GS980M Series Quick Installation Guide
Duplex Mode
or PoE+ LEDs