CPI 1132 Series Manual de montaje - Página 15

Navegue en línea o descargue pdf Manual de montaje para Antena CPI 1132 Series. CPI 1132 Series 15 páginas.

CPI Satcom & Antenna Technologies
SECTION IV
4.0

MAINTENANCE OVERVIEW

After installation, the antenna requires only periodic inspection.
anticipated that maintenance, if required, will be minimal and easily handled
by a local or in-house maintenance staff.
4.1

REFLECTOR

CPI's reflector does not require any maintenance. The composite construction of
the reflector is virtually impervious to any damages that could be caused by
weather or atmospheric conditions. It is only necessary to inspect for any physical
damage done by vandalism or very severe weather conditions.
Should any damage be detected to a portion of the reflector, contact the Customer
Service Department at CPI for recommendations involving reflector repair.
4.2
MOUNT AND REFLECTOR SUPPORT STRUCTURE
The mount and reflector support structure supplied with this antenna is of steel
construction and has a galvanized finish.
If there are any signs of structural failure, the mount members that are damaged
should be repaired or replaced.
4.3
FEED AND FEED SUPPORT
The feed support and feed rods should be inspected to insure that all hardware is
secure. The feed/radio mounting bolts should be tight.
The feed horn window should be inspected to insure that it is intact so that no
moisture can collect inside the feed horn.

MAINTENANCE

1.2M Ku-BAND Rx/Tx SERIES 1132
14
4096-630
It is