CPS BlackMAX VPC Series Manual de instrucciones - Página 7

Navegue en línea o descargue pdf Manual de instrucciones para Bomba de agua CPS BlackMAX VPC Series. CPS BlackMAX VPC Series 8 páginas. Cordless vacuum pump

CPS BlackMAX VPC Series Manual de instrucciones
4. Open manifold valves.
5. Turn vacuum pump power switch "ON".
6. Run vacuum pump until final vacuum level is met.
-Do not run vacuum pump continuously for more than 2 hours.
7. Once the final vacuum level is reached, close manifold vavles, turn power switch
"OFF".
It is recommended to change the vacuum pump oil after 25 hours of usage. The purity of the
oil will determine the final vacuum level achieved. Always use the CPS recommended vacuum
pump oil (VPOQ / VPOP / VPOG). The oil provided with the pump has been specially blended
to maintain maximum visosity at normal running temperatures as well as cold weather starts.
OIL CHANGE PROCEDURES:
1. Be sure the pump oil is warmed up. if not warm, turn vacuum pump "ON" for 5
minutes.
2. Make sure vacuum pump is not plugged in.
3. Remove the oil drain cap and drain the contaminated oil into a suitable container. Tilt
the vacuum pump toward the oil drain port.
4. Once all the oil has been drained, re-secure the oil drain cap back onto the oil drain
port.
5. Remove the exhaust / oil fill cap and add oil until it is seen in the middle of the oil sight
glass. Re-secure exhaust / oil fill cap.
Vacuum Pump Operation
Vacuum Operation Complete
Vacuum Pump Operation

Routine Maintenance

7
OPERATION