INSTALLATION CHECKOUT PROCEDURE -
TO BE DONE PRIOR TO OPERATION
This Installation Checkout Procedure is intended to be used upon initial receipt of equipment and
following any relocation of a permanent mounted Load Bank. These procedures apply to Load
Banks in general and may include steps not relevant to the specific unit being installed. Disregard
those procedures which do not apply.
*************************************************************
THE FOLLOWING TESTS ARE TO BE ACCOMPLISHED BY A
QUALIFIED
EXTREME CAUTION AS POTENTIALLY LETHAL VOLTAGES
AND
PRESENT. IF ASSISTANCE IS REQUIRED, AVTRON CAN
PROVIDE START UP SERVICE AT A NOMINAL CHARGE.
AVTRON ALSO WILL PROVIDE TELEPHONE ASSISTANCE IF
REQUIRED BY CALLING (216) 641-8310.
*************************************************************
1.
Verify the Load Bank placement meets the installation requirements found in the
INSTALLATION section of the instruction manual:
A.
Check the clearance from both intake and exhaust to any obstruction.
B.
If the location has a prevailing wind, make the wind aid in the cooling of the resistor
elements.
C.
Duct exhaust air outdoors via a customer-supplied exhaust hood which, along with
intake losses, creates no more than 0.25" total system static pressure (pressure drop).
2.
Check the mechanical integrity of all customer-supplied interconnection wiring:
A.
Check lugs that they are properly crimped.
B.
Check terminations that they are properly torqued.
3.
Utilize system schematics to ohm out customer-supplied interconnection control wiring and
safety circuits: