DH Lifelabs Sciaire Storm HD110 Manual de instrucciones - Página 6
Navegue en línea o descargue pdf Manual de instrucciones para Limpiador de aire DH Lifelabs Sciaire Storm HD110. DH Lifelabs Sciaire Storm HD110 14 páginas.
Packaging
1. Remove the device from the box. Confirm all items shown in the Product Overview are included. It is
recommended to retain the packaging in case of storage or repair purposes.
2. Place the device on a cloth to avoid marking its surface, and to confirm installation location prior to setup.
Suggested Mounting Height
Users
Height (to Bottom of Device)
Men
45 Inches (1143 mm)
Women
43 Inches (1092 mm)
Teenagers
41 Inches (1041 mm)
Small Children
35 Inches (889 mm)
Accessible
37 Inches (940 mm)
Countertop
15 inches (381 mm)
Electrician may be needed for power wiring/rerouting wiring.
1. It is imperative that the location of the hole drilled for the power cable input wires matches up with the
appropriate placement of the device.
2. There is a recommended height for each segment of user. The height is to be measured from the floor to
the bottom of the device.
3. To mark the proper placement for the power cable input hole, refer to the placement sticker included
in the packaging. Do not remove the backing to the sticker if not immediately installing device after
electrical work is complete. Utilize the sticker to mark the wall for the exact location of the power input for
accurate electrical wiring placement.
7
7
#31 安装贴纸,
材质:80g铜版可移不干胶,单面背胶(可撕开,不可太粘),彩印,
Installation
If installing ADA Compliance Kit,
skip ahead to page 12.
1
Position Installation Sticker
Position the installation sticker on the intended
wall based on the location of the power cable
input. The power cable input may be newly
installed fvor accurate placement of the device.
Ensure the diameter of the hole for the power
cable input is as displayed on the sticker.
2
Drill Mounting Holes
Drill 4 mounting holes according to the marks.
3
Insert Expansion Tubes
Tear off the lower part of the sticker along the
line. Insert the expansion tubes (4) into the
mounting holes.
290MM
TOP LINE
TOP LINE
UPPER PART
可撕分离线
Tear line
TEAR ALONG THIS LINE
TEAR ALONG THIS LINE
Power Cable Input
POWER CABLE INPUT
LOWER PART
Mounting holes
4
Align the holes of the mounting bracket and the
mounting holes on the wall. Insert the wood screws
to the holes. Tighten the wood screws to fix the
mounting bracket to the wall.
8