Dell PowerEdge 2800 Conversión Manualline - Página 7

Navegue en línea o descargue pdf Conversión Manualline para Servidor Dell PowerEdge 2800. Dell PowerEdge 2800 36 páginas. Poweredge 2800 server
También para Dell PowerEdge 2800: Información actualizada (24 páginas), Manual de instalación (22 páginas), Manual (44 páginas), Instalación del hardware (14 páginas), Referencia rápida (2 páginas), Especificaciones (2 páginas)

Dell PowerEdge 2800 Conversión Manualline
Y1001bk0.book Page 5 Thursday, July 8, 2004 4:32 PM

Safety Instructions

Use the following safety guidelines to ensure your own personal safety and to help protect your
server, storage system, or appliance from potential damage. For complete safety and regulatory
information, see your System Information document. Warranty information might be included
within this document or as a separate document.
Precautions for Rack-Mountable Products
Observe the following precautions for rack stability and safety. Also refer to the rack installation
documentation accompanying the system and the rack for specific warning and/or caution
statements and procedures.
Servers, storage systems, and appliances are considered to be components in a rack. Thus,
"component" refers to any server, storage system, or appliance, as well as to various peripherals or
supporting hardware.
CAUTION:
Installing system components in a rack without the front and side stabilizers installed could
cause the rack to tip over, potentially resulting in bodily injury under certain circumstances. Therefore,
always install the stabilizers before installing components in the rack.
CAUTION:
After installing system/components in a rack, never pull more than one component out of
the rack on its slide assemblies at one time. The weight of more than one extended component could
cause the rack to tip over and injure someone.
NOTE:
Your system is safety-certified as a free-standing unit and as a component for use in a rack
cabinet using the customer rack kit when both the rack cabinet and rack kit were designed for your
system. The installation of your system and rack kit in any other rack cabinet has not been approved by
any safety agencies. It is your responsibility to have the final combination of system and rack kit in a
cabinet evaluated for suitability by a certified safety agency. The manufacturer disclaims all warranties
and liability in connection with such combinations.
System rack kits are intended to be installed in an approved rack by trained service
technicians. If you install the kit in any other rack, be sure that the rack meets the
specifications.
CAUTION:
Do not move large racks by yourself. Due to the height and weight of the rack, it is
recommended that a minimum of two people perform this task.
Before working on the rack, make sure that the stabilizers are secured to the rack, extend to
the floor, and that the full weight of the rack rests on the floor. Install front and side stabilizers
on a single rack or front stabilizers for joined multiple racks before working on the rack.
Always load the rack from the bottom up, and load the heaviest item in the rack first.
Make sure that the rack is level and stable before extending a component from the rack.
Use caution when pressing the component rail release latches and sliding a component into or
out of a rack; the slide rails can pinch your fingers.
After a component is inserted into the rack, carefully extend the rail into a locking position,
and then slide the component into the rack.
Tower-to-Rack and Rack-to-Tower Conversion Guide
5