Dell PowerEdge 4x00 Series Manual de instalación - Página 9
Navegue en línea o descargue pdf Manual de instalación para Servidor Dell PowerEdge 4x00 Series. Dell PowerEdge 4x00 Series 28 páginas. Rack installation guide
También para Dell PowerEdge 4x00 Series: Instalación de bastidores (37 páginas), Manual del usuario (42 páginas), Instalación de bastidores (34 páginas), Manual de instalación (37 páginas)
support.dell.com
WARNING: Never pull more than one system out of the rack on its slide
assemblies at one time. The weight of more than one extended system
could cause the rack to tip over and injure someone.
The stabilizer feet help prevent the possibility of the rack tipping over when a
system or other components are pulled out of the rack far enough so that the slide
assemblies are fully extended. Refer to the Dell PowerEdge Rack-Mountable
Solutions Installation Guide provided with the rack for instructions on installing the
stabilizer feet.
Recommended Tools
To install the tower kit, you need the following tools:
•
A #2 Phillips screwdriver
•
A flat-blade screwdriver
Installation
To install a tower kit, perform these steps (see the following subsections for detailed
instructions):
1.
Shut down and turn off the system.
2.
Remove the rack's front and rear doors.
3.
Remove the cable management arm.
4.
Remove the cable tray.
5.
Remove the system from the rack.
6.
Replace the rack doors.
7 .
Install the rubber feet.
8.
Remove the front bezel.
9.
Reorient the drives.
10. Reorient the system badge.
11. Replace the front bezel.
12. Attach the cables and turn the system on.
Shutting Down and Turning Off the System
It is usually best to perform this installation at a time when there are no users on the
system. Shut down all application programs running on the server and turn off the
system.
Dell PowerEdge 4x00 and 6300 Systems Tower Installation Guide
1-3