Installation
WARNING: DO NOT CONNECT TO POWER
BEFORE MECHANICAL INSTALLATION
IS COMPLETE. ALWAYS DISCONNECT
POWER BEFORE HANDLING.
1.
Mount Sciaire Pro H100 in a location with general maintenance
access. Ensure the brush tips are not within ¾" of any metallic
surface to prevent arcing.
2.
Mount the unit at or near the fan inlet using the holes in the
mounting flanges, ensuring that the air stream flows over the 2
brush tips simultaneously. See graphic below for reference.
3.
The unit should be mounted downstream of the filter.
4.
Avoid locations directly after a cooling coil or humidifier.
5.
Exit ducts are recommended to install a group of plasma generators
every 20 meters to ensure ion concentration .
6.
Add a group of plasma generators in the middle near the outlet
with a 1-2 meters distance to ensure the concentration of ions in the
room.
3
Electrical Installation
1.
All field wiring to be in accordance with NEC and Authorities Having
Jurisdiction (AHJ).
2.
It is recommended that surge protection be installed with this
ionizer at the equipment level, building level, or circuit breaker
panel feeding the product.
3.
If a step-down transformer is used to feed the ionizer, the
transformer must be grounded (recommended 20 VA minimum).
4.
Do not install the ionizer on the same circuit as a UV Lamp or
connect to the same transformer as a UV Lamp.
5.
Connect power to the ionizer using appropriate voltage.
6.
The installer shall provide a power source that is properly grounded
per the local AHJ.
7.
For best results interlock ionizer with fan power.
8.
Apply power to unit. Confirm that green indicator light illuminates
indicating that the ionizer is functioning properly.
Operation
1.
When power is supplied to the ionizer, the ionizer will be activated,
and the green ion indicator LED will illuminate.
2.
The ionization unit is self-balancing and does not require any type
of adjustment.
Sequence of Operation
For units that are interlocked with the supply fan control, the
BAS controls the start/stop of the air conditioning unit supply
fan.