EarthCore ISO'ven Manual de instalación, funcionamiento, mantenimiento y uso - Página 9

Navegue en línea o descargue pdf Manual de instalación, funcionamiento, mantenimiento y uso para Horno EarthCore ISO'ven. EarthCore ISO'ven 16 páginas. A personal size family wood fired oven

Step 15:
Caulk top of all liner pieces and lay oven liner top
plate on to side, front & back walls. Cut and place a piece of
inswool over liner top plate as shown.
(Figure 12)
Step 16:
Mortar Isokern side walls, front and back walls of
the Isokern product with ECI mortar provided. (Figure 13)
Next mortar top plate of Isokern material to the top of the
Isokern smokedome side wall, front and rear walls with the
ECI mortar provided.
Step 17:
Finally, seal gap between oven liner front wall and
Isokern front wall completely with ECI mortar.
(Figure 13)
Step 18:
The thermometer has a 6 1/2" or 9" stem. A hole
should be drilled into the upper right quadrant of the oven
walls, just thick enough for the stem to be pushed through.
The face of the thermometer can be counter sunk into the
Isokern material or left a bit raised. The length of your
thermometer stem will be determined by your facing material
and the look you wish to achieve. The tip of the probe should
either penetrate the oven slightly or penetrate the liner of
the ISO'ven. Use the shorter stem for thin , exterior facing
applications such as stucco. Use the longer stem for thicker,
exterior applications such as brick or stone veneers. After
insertion of the thermometer, mortar into place. (Figure 14)
ISO'ven Curing Instructions:
It is critical that the Isokern elements in the ISO'ven
assembly be dry before firing of the unit. Moisture left in
the ISO'ven components from exposure during storage and
shipping, as well as moisture from the installation phase,
must be eliminated before the unit is put to its intended use.
The first step in reducing the ambient moisture is to
be sure that the completed ISO'ven rest totally in a dried-in
setting for a minimum of 14 days after construction of the
unit is complete.
The next step in curing the ISO'ven is to be sure that
the first three or four fires are of short duration. These fires
can take place after the first week of installation. Make small
kindling fires to about 200 - 300 degrees to dry out any last
moisture from the unit.
Assembly Instructions Continued
9
ECI Mortar
High Temp
Caulk
Figure 12
Figure 13
ECI Mortar
Inswool