Dell PowerVault 35F Manual de instalación - Página 13
Navegue en línea o descargue pdf Manual de instalación para Almacenamiento Dell PowerVault 35F. Dell PowerVault 35F 50 páginas. Fibre channel bridge rack
También para Dell PowerVault 35F: Manual (48 páginas)
2.
Tighten the eight 10-32 x 1/2-inch screws that mount the outer slides to the rack.
3.
Tighten the thumbscrews on the bezel to keep the bridge and slide assembly
from sliding out of the rack.
The thumbscrews pass through the holes in the rack and into the middle holes of
the stationary brackets.
Use the following procedure to replace the rack's front and back doors.
1.
Lift the front door into position, and align the hinges with the holes in the rack as
shown in Figure 1-2.
2.
Slide the hinges into the holes in the rack until the hinge release levers lock the
hinges into position.
3.
Close the door latch by rotating the handle counterclockwise until it stops, push
the handle in until it locks in position, and then slide the push-button cover down
over the push button (see Figure 1-1).
Repeat steps 1 through 3 to install the back door.
Dell PowerVault 35F Fibre Channel Bridge Rack Installation Guide
1-9