Dell Networking N20 Series Manual de instalación - Página 31
Navegue en línea o descargue pdf Manual de instalación para Interruptor Dell Networking N20 Series. Dell Networking N20 Series 49 páginas.
5
Inspect the product and accessories for damage.
Rack Mounting an N30xx Switch
You may either place the switch on the rack shelf or mount the switch directly into a 19" wide, EIA-310-E compliant rack (four-post, two-
post, or threaded methods). The Dell ReadyRail system is provided for 1U front-rack, and twopost installations. The ReadyRail system
includes two separately packaged rail assemblies.
WARNING:
This is a condensed reference. Read the safety instructions in your Safety, Environmental, and Regulatory
information booklet before you begin.
NOTE:
The illustrations in this document are not intended to represent a specific switch.
Rack Mounting Safety Considerations
•
Rack loading — Overloading or uneven loading of racks may result in shelf or rack failure, causing damage to equipment and possible
personal injury. Stabilize racks in a permanent location before loading begins. Mount components beginning at the bottom of the rack,
then work to the top. Do not exceed your rack load rating.
•
Power considerations — Connect only to the power source specified on the unit. When multiple electrical components are installed in
a rack, ensure that the total component power ratings do not exceed circuit capabilities. Overloaded power sources and extension
cords present fire and shock hazards.
•
Elevated ambient temperature — If installed in a closed rack assembly, the operating temperature of the rack environment may be
greater than room ambient. Use care not to exceed the 45 degrees C maximum ambient temperature of the switch.
•
Reduced air flow — Install the equipment in the rack so that the amount of airflow required for safe operation of the equipment is not
compromised.
•
Reliable earthing — Maintain reliable earthing of rack-mounted equipment. Pay particular attention to supply connections other than
direct connections to the branch circuit, for example: use of power strips.
•
Do not mount the product with the rear panel facing in the downward position.
Installing the Dell ReadyRails System
The ReadyRails rack mounting system is provided to easily configure your rack so that you can install your switch.
Install the ReadyRails system using the 1U tool-less method or one of three possible 1U tooled methods (two-post flush mount, two-post
center mount, or four-post threaded).
1U Tool-less Configuration
To install the Dell ReadyRails system using the 1U tool-less configuration with four-post square holes or unthreaded round holes, follow
these steps.
1
With the ReadyRails flange ears facing outward, place one rail between the left and right vertical posts. Align and seat the back flange
rail pegs in the back vertical post flange. To see how the pegs appear in both the square and unthreaded round holes, see Figure 17.
2
Align and seat the front flange pegs in the holes on the front side of the vertical post.
3
Repeat this procedure for the second rail.
4
To remove each rail, pull on the latch release button on each flange ear and unseat each rail.
30
N30xx Series Installation