360 Yield 360 Y-DROP HAGIE DTS 2016 + Manual de instrucciones - Página 3

Navegue en línea o descargue pdf Manual de instrucciones para Maquinaria agrícola 360 Yield 360 Y-DROP HAGIE DTS 2016 +. 360 Yield 360 Y-DROP HAGIE DTS 2016 + 10 páginas.

ESTABLISH
I.
DROP LOCATIONS
Figures 1 and 2
Step 1
Locate the center of the machine and
identify the location of all the drops. On
the sprayer boom, mark where each riser
mount will be located. This will ensure
that the extension tubes will not interfere
with the riser mounts.
Figure 3
Step 2
Starting at the wing fold pivot pin on
the primary boom, measure and mark
points at 40", 100", 160"; 220" and 280"
(all measurements are ±5"). Repeat for
the other primary boom.
INSTRUCTIONS 360 Y-DROP
Figure 1
Figure 2
40"
100"
160"
Figure 3
360YIELDCENTER.COM
HAGIE DTS 2016 +
280"
220"
3