360 Yield 360 Y-DROP JOHN DEERE 4710 Manual de instrucciones - Página 5

Navegue en línea o descargue pdf Manual de instrucciones para Maquinaria agrícola 360 Yield 360 Y-DROP JOHN DEERE 4710. 360 Yield 360 Y-DROP JOHN DEERE 4710 12 páginas.

INSTALL MOUNT ASSEMBLIES
II.
ON THE OEM PRIMARY BOOM
Figure 7
Step 7
With the U-bolt pointing to the rear,
install the yoke mount (1) and flange
nuts to upper boom section.
Step 8
With the square U-bolt threads pointing
up and using the extra thick washer and
Nylock nut, install yoke mount (2) to the
360 Y-DROP boom section.
Step 9
Using pins, install the yoke straps (3)
between the upper boom and 360
Y-DROP boom. Using the flange nuts,
tighten the 1-1/4" carriage bolts.
Repeat Steps 7-9 for the remaining yokes on
the OEM primary booms. Yokes should be spaced
approximately 60" (±5") apart.
(CONTINUED)
1
Figure 7
INSTRUCTIONS 360 Y-DROP
JOHN DEERE 4710
3
2
360YIELDCENTER.COM
5